Monday, November 11, 2013

Wood Work



Dateline – 11/09/2013 – This weekend I focused on the dash.  My buddy Matt, who I bought the car from and who has helped me with all the woodwork on the project (see post http://www.leapingv8s.blogspot.com/2011/12/recaping-summer-and-new-work.html) invited me over on Saturday and so we got a chance to do more work on the dash.  It’s been almost a year since I’ve worked on the wood and it is getting time to start finishing things up.  I had a bit of a shock a couple of months ago when I pulled the pieces out and found that a rag covered in silicone tire dressing had been sitting on the unfinished center wood piece!  I thought the piece was ruined.  But fortunately, we were able to run it through the sander and remove all the silicone except for a spot about the size of a pencil eraser in the upper left corner.   I’m very pleased about that!

Another thing we worked on was adding more wood to that center piece so that the wood wraps around the center console.  At the time we did the initial woodwork, I wasn’t sure how all the pieces would fit together.  Now that I have everything fitted, I found that I needed more wood added to the center piece so that it wraps down the sides of the console.  Matt came up with the idea of shaping a piece of plywood to fit and then gluing that to the center piece.  Once dry, a piece of veneer would be glued to that.  After sanding, filling and finishing, there may be a small seam, but it will still look good.  We got as far as gluing the plywood to the center piece but ran out of time to glue the veneer.  I’ll do that later.

Monday, November 4, 2013

Both Tanks In



Dateline – 11/02/2013 – Saturday was devoted to getting the left side gas tank in.  But first, I realized I had to pull the right side tank out because yours truly forgot to install the drain hose that drains the filler cap depression on the top of the fender!  Can you say, “D’OH!”  Fortunately, the tank came out pretty quickly, and now that I know how to install it, went back in quickly.

The left side tank couldn’t go in until I put the soundproofing panel into the fender.  I think I explained in a prior post that this panel is held in using strip caulk.  It’s a pain to do this work because you have to reach way up into the fender.  But I got the panel in.  Then it was just a matter of putting the tank in screwing it down and putting in the fittings.  Pretty easy actually!

The latter half of the day I spent doing a final fitting of the center console fascia.  I needed to make sure that the shift lever and hand brake lever all fit correctly before I did the final work on the fascia.  It’s pretty close, but I still have a few minor adjustments to make. 

I also took the time to determine how the new hand brake cable is going to run through the original air box that is located in the console.  A pretty advanced feature for this year of car, the Jaguar had airflow to the back seat area.  It has a vent in the center of back of the console, plus airflow vents going down to the passenger’s feet that have separate controls.  All of this is controlled by an air box that sits under the center console armrest pocket.  Two hoses running from the main air control in the dash feed the air box.  Pretty neat and easy system.

Because I now have a handbrake cable running through were the air box sits, I had to make some modifications.  The good news was that I just need to drill some holes through the air box to allow the cable to go through.  I’m not worried about air leakage, since the box isn’t designed to be airtight.

So, next week looks like a good time to put down the sound proofing!  All I can say is that it is really coming along!

Monday, October 28, 2013

Welcome to the 2013/2014 Project Car Season!



Dateline - 10/26/2013 - I’m officially kicking off the 2013/2014 Project Car Season.  Last weekend I cleaned up the garage and workbench and changed the status of the Jag from SUV (Storage Utility Vehicle) back to working project, which set me up for this weekend of work.

To catch you up, last year left off with a few things that needed to be completed before the car could be painted.  They included:


  • Gas Tank installation
  • Final fitment of the center console
  • Fitment of new mirrors and hood latches
  • Interior sound proofing
  • Undercoating of insides of fenders
  • Final mounting of fenders, doors, boot and hood
  • Degrease the engine bay
  • Final sanding of the exterior


So, not a lot to do to finish up.

You may remember that last year I ordered two new gas tanks.  The tanks I ordered were supposed to be straight replacements, but when they came in, I found that they physically fit in the car, but the tanks have different fittings for the gas line, and have an added return port that my car did not use.  You would think that these fittings would not be hard to find, but you would be wrong!  Apparently, the fittings are an English standard and are just about “unobtanium”.    I was able to get a plug for the return from Barret Motors, but the fuel line that I got from then did not fit.  So after looking at everything I could, I finally contact the tank maker to see if they sold the fittings.  They did not, but they did give me the specs for it. It’s a 9/16 x 24 UNEF fitting.  Now, to say these are hard to find is an understatement.  Hours and hours on the internet turned up only a few sources.  So finally I was about to get the fittings, from of all places, a marine hydraulic steering system.  So $50 later I have the fittings in hand!  The moral of the story is that if I count up the time and money spend to find these fittings, I could have bought the correct tanks from a Jaguar supplier!  To be fair to myself though, everything I could find said that these tanks fit my car.  I just didn’t realize that “fit” means that it physically fit the car.  The fittings don’t count!

So, Saturday was spent putting the right side tank in.  First I putting the fitting in the tank, sealing them with Rectoseal 5 just to make sure there are no leaks.   The tank fit easy in the space, all the mounts lined up and screws worked fine.  It was a bit fiddly because I also have to line up the filler neck, which screws into the body and drops directly into the tank.  So getting that right took a few adjustments, but easy enough to do.

Once the tank was installed, I ran a copper 3/8 pipe from the tank into the trunk.  This is where I spent the rest of the day because I now had to build the “fuel management system.”  The car has two tanks, but only one fuel gauge.  The original car had two fuel pumps, one for each tank, that fed into a single Tee fitting that then went to a fuel filter then to the engine.  When the driver selected a tank using fuel selection switch, the appropriate pump would be activated and the sender unit for that tank would be routed to the gauge. 
   
With the engine conversion, the engine mounted fuel pump was used and the old fuel pumps were taken out of the car. When I got the car only one tank was being used because the other leaked, so there was not need to worry about the tanks.  Now that I have two tanks and I needed to be able to control the fuel flow.  I could just connect the tanks together via the tee, but I worried about possible fuel starvation and problems when filling the tanks.  So I decided to buy two fuel cut-off valves that would be activated by the fuel tank selection switch in the car.  The wiring already existed for this.  It was just a matter of installing the valves and plumbing everything appropriately.  Of course, this took much more time than I thought it would, but as you can see from the pictures, the results look nice and professional!

Tank with Fittings.

Right hand tank in car


Tank and fitting.  Looking toward front

Fuel Management System.  Looking toward rear

Fuel Management System.  Looking left to right.


So, you may be asking, why didn’t I install the left hand tank?  That’s because I still have a lot of work to do on that side.  As I talked about in this post (http://www.leapingv8s.blogspot.com/2013/07/emergency-brake-done.html) there is a panel that needs to be installed in the fender and sealed in so that sound and water don’t make it to the rocker panel in the back.  I completed it on the right side of the car, but ran out of sealing material for the left side.  I got the material in over the summer but I have done no more work.  So this weekend I painted the inside of the fender in prep for putting the panel in and sealing it.  I’m thinking I can get all that done next weekend, plus get the tank installed!

So, starting the new Project car season off with a lot of success!