After welding in the bottom and back deck pieces and the bottom of the window frame I then concentrated on replacing the sheet metal around the back C pillar that had rotted away. I don’t have pictures of the before, but here is the after. Note that I have sealed all the seams with Eastwood seam caulk, primed and painted.